Who may enter?
Users, visitor groups, zones and time profiles.
RESULT · Access and authorisation matrix
Planning logic for schools and comparable public buildings. From users and protection goals to operating states, system requirements and evidence.
Discuss your planning questionsThese questions frame a professional discussion. They do not replace a project-specific assessment or the required approvals.
Users, visitor groups, zones and time profiles.
RESULT · Access and authorisation matrixEveryday exit, unfamiliar users and evacuation scenarios.
RESULT · Direction-specific escape requirementsFire, smoke, escape-route and security functions; evidence for the complete assembly.
RESULT · Defined protection requirementsClosing, latching, re-locking and any authorised hold-open period.
RESULT · Documented operating sequenceCylinder, fitting, lock, strike or separate locking element; compatibility and feedback.
RESULT · Interface and responsibility schedulePower loss, unavailable network, depleted batteries and recovery to normal operation.
RESULT · Agreed failure and recovery conceptConsider door position, mechanical locking, access permission and escape-side operation separately in each scenario.
A door may be closed without being deadlocked. Record closing, latching and locking separately, together with the permitted access direction.
An access-granted signal is a permission or command. It does not by itself confirm that the door opened, closed or re-locked.
Fire, smoke, evacuation and security events may require different behaviours. Resolve the project-specific sequence and priorities with the responsible planners.
Evaluate power, network, server and battery failures individually. Establish what remains available locally and how normal operation is restored.
Agree responsibilities explicitly for the project. The examples below identify typical coordination questions.
| Layer | Question to resolve | Planning output |
|---|---|---|
| Building & use | Who uses the opening; which zones and protection goals apply? | Door profile and operating scenarios |
| Door & hardware | How do leaf, frame, closer, fittings and lock work together? | Coordinated assembly requirements |
| Access control | Where does authorisation act, and what changes mechanically? | Release sequence and rights structure |
| Electrical & building systems | Which supply, signals and dependencies are required? | Interface and responsibility schedule |
| Operator & handover | Which states must be known, tested and documented? | Verification plan and operating information |
A door-position contact does not, by itself, prove deadbolt engagement. Specify the statement needed by the operator and identify suitable evidence for that statement.
Confirm use, zones and protection goals.
Agree operating states and failure behaviour.
Coordinate components, interfaces and equivalence criteria.
Define approval, testing, handover and maintenance information.
Fire- and smoke-protection requirements concern the relevant door assembly and its evidence. Electronic escape arrangements and compatibility must be assessed for the actual configuration.
Tell us the building’s use, your project phase and the question you need to resolve. Existing plans, a door schedule or a draft specification provide a useful starting point.
We clarify the advice needed and agree the next step with you. Project work may cover a functional concept, technical specifications, tender comparison or coordination through testing and handover.
Enquire about a consultation€150 net per consultation appointment, plus VAT
Discuss your requirements, available documents and next planning decisions. Detailed concepts, specifications and further project support are scoped and quoted separately.
Sending an enquiry does not book a paid appointment. The appointment and its terms are agreed with you beforehand.